Electrical Instrumentation Controls

Granite Ridge Pump Station

Apex Construction was contracted by Severino Construction to build a municipal water booster station at the Granite Ridge Market Place commercial development in Rochester, NH. Barrett Electric was contracted to provide power, emergency generator, pump control panel installation and wiring, and SCADA wiring and commissioning. The project included power, 5 pumps, PLC and VFD controls, pressure/flow metering and control, and heating/cooling. 

Contact Us

Contact Form

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*