Route 28 Pump Station

The Town of Derry, NH contracted with Infrastructure Construction Corporation to build a water pumping station as part of a large civil project. Barrett Electric was contracted to provide power, switchgear, emergency generator and SCADA wiring and commissioning. The project included power, 5 pumps, PLC controls, VFDs for all pumps, pressure/flow metering and control, telemetry, and heating/cooling.