Granite Ridge Pump Station
Apex Construction was contracted by Severino Construction to build a municipal water booster station at the Granite Ridge Market Place commercial development in Rochester, NH. Barrett Electric was contracted to provide power, emergency generator, pump control panel installation and wiring, and SCADA wiring and commissioning. The project included power, 5 pumps, PLC and VFD controls, pressure/flow metering and control, and heating/cooling.
![]() |
![]() |




In our Panel shop we build, design, and test electrical control panels for the water and waste water market as well as for our industrial clients. Our panels are UL 508A listed and marked.