Back to Industrial Services - Learn more about our UL 508A Control Panel Shop
Granite Ridge Pump Station
Apex Construction was contracted by Severino Construction to build a municipal water booster station at the Granite Ridge Market Place commercial development in Rochester, NH. Barrett Electric was contracted to provide power, emergency generator, pump control panel installation and wiring, and SCADA wiring and commissioning. THe project included power, 5 pumps, PLC and VFD controls, pressure/flow metering and control, and heating/cooling.
|
Route 28 Pump Station
The Town of Derry, NH contracted with Infrastructure Construction Corporation to build a water pumping station as part of a large civil project. Barrett Electric was contracted to provide power, switchgear, emergency generator and SCADA wiring and commissioning. The project included power, 5 pumps, PLC controls, VFDs for all pumps, pressure/flow metering and control, telemetry, and heating/cooling.
River Street Pump Station
Kingsbury Construction hired us to wire the new enclosed Pump Station at River Street in Jaffrey, NH.